Equipment Catalog

Each RECON team is provided a telescope, laptop computer and IOTA timing box set up. Below is a diagram of the wiring, and individual pictures of each wire transferring power and data between the devices.

Wires:

A. 6” 12V male lighter plug to two female lighter plug Y-cable
B. telescope power cable (came with telescope), lighter plug to barrel
C. 3’ cable, straight female barrel to 90º male barrel
D. 24” 12V male lighter plug to male barrel
E. 24” CCTV Power “Y” cable, female barrel to two male barrels
F. 25′ CCTV video/power cable (very long)
G. 3’ cable, RCA video both ends
H. USB video to RCA adapter

A. 6” 12V male lighter plug to two female lighter plug Y-cable

B. Telescope Power Cable, lighter plug to barrel

C. 3’ cable, straight female barrel to 90º male barrel

D. 24” 12V male lighter plug to male barrel

E. 24” CCTV Power “Y” cable, female barrel to two male barrels

F. 25′ CCTV video/power cable (very long)

G. 3′ Cable, RCA video both ends

H. USB video to RCA adapter.  Driver for SVID2USB23

NC to RCA adapter- into IOTA

 

IOTA-VTI front

IOTA-VTI back

Laptop Computer